Palo Verde

Palo Verde

Electrical Project CustomerGeneral Electric (GE) End UserAPS Palo Verde SitesArizona, USA Product(3) 15' x 60' (4.6m x 18.3m) Excitation Buildings w/ 100T HVAC ChallengeDesign Exciter Compartment with severe environmental and code requirements for Nuclear application....
Florida Power & Light

Florida Power & Light

Electrical Project CustomerGE Energy End UserFlorida Power & Light SiteFort Lauderdale, FL USA ChallengeDesigned to be erected on-site with fully integrated electrical service and HVAC. The design must also be certified to sustain a 200 MPH (322KPH) wind...
Microsoft

Microsoft

Electrical Project CustomerEaton End UserMicrosoft SitesVirginia, Washington, & Wyoming ProductCustom designed Deposit on Base Enclosure (DOBE) for MV Switchgear ChallengeShort lead time to place buildings on-site SolutionAMR PEMCO devised a floor-less building...
LA Metro

LA Metro

Electrical Project CustomerBalfour Beatty Rail End UserLA Metro SitesLos Angeles Area - California USA ProductTraction Power Substations for Blue and Gold Line Extensions ChallengeCoordinate installation between Mass Electric and the LA...
Southern Company

Southern Company

Electrical Project CustomerEaton End UserSouthern Company SitesSmith Hydro Dam - Alabama USA Product5,500 Amp enclosure vacuum generator breakers ChallengeNo catalog (off-the-shelf) offering to replace old and faulty oil filled generator breakers equipment...

Head Office

PO Box 234
12187 N Scenic Highway
Rocky Gap, VA 24366

T:  +1-800-541-5583
P:
  +1-276-928-1712
F:  +1-276-928-1815

Hours of operation:
Monday - Friday
8:00AM - 4:30PM EST

Bluefield Facility

1960 Valley Dale Street
Bluefield, VA 24605-9454

GPS > 700 Fincastle Tnpk

T:  +1-800-428-7800
P:  +1-276-326-2611

Hours of operation:
Monday - Friday
8:00AM - 5:00PM EST

Contact Us